Clark County School District, Von Tobel Middle School Replacement
Location:
Las Vegas, Nevada
150,850 SF
Size:
Von Tobel Middle School, targeted to serve 1,250 students, is the 4th iteration of our CCSD Middle School prototype design.
The new 150,000 SF school is constructed on an undeveloped site and includes sixth, seventh, and eighth grade general and specialty classrooms along with centers for administration, student activity, physical education, fine and performing arts, theater, arts and technology, and maintenance and operations.
Each of these program requirements was addressed while providing access to daylight for every classroom and learning space. Von Tobel benefits from an educationally driven plan that organizes the academic core around flexible collaboration spaces, breakout rooms, team areas, and a media center to support small group instruction and project based learning.
A two way performance platform connects the gymnasium and theater to expand activity and event options. Campus planning supports a courtyard focused layout that encourages outdoor learning and clear circulation.
Durable, low maintenance materials and high performance strategies, high efficiency MEP and lighting systems, on site photovoltaic arrays, and water saving measures, are integrated to reduce long term operating costs while supporting comfort, safety, and security through clear sightlines and controlled access points.






















